Friday, November 27, 2009

Well, I had mentioned before that pictures of our bathroom re-modeling would follow so here some of them are. The first picture shows the wall just after the knock down texture was applied and before we started painting.














The second picture shows a really rough looking floor just after the tiles were laid. Todd helped identify the worst eye-sores and popped up some tiles. I re-laid them and think the floor looks much better for it.















Floating in the grout was a job Daniel had done previously and this seemed to be the easiest part of the whole project. Painting was an ongoing task. The walls had to be painted from olive green to a "milky-toast" and the bead board and door along with a cabinet we went dumpster diving for were painted white. It was nice to have Anna's help whether it was doing the actual painting or supervising William as he helped.

With the bead board up and the floor laid down caulking came next as did putting the toilet back into place. The whole project ate up about a month of time but I felt I learned a lot from the project. Jessica designed the project and I attempted the construction of the plan and we were both greatly blessed to have the advice and help from family members.

1 comment:

Sarra said...

Oo, I love how it looks in the last picture! Great job everybody!